SpaceX’s current US project, Starmind Al1 – featuring a satellite-based AI computer in space – once again highlights just how high the demand for data centres already is. In Germany, too, demand for the necessary network capacity is rising. When building new data centres, operators must take into account both the power consumption and the electrical connected load of a data centre. The latter specifies the maximum electrical power a data centre can draw via its grid connection, and thus determines the capacity the electricity grid must provide for the respective location. As our new analysis shows, this connected load is distributed very unevenly across Germany’s regions. For this study, we examined the connection capacity of existing data centres across Germany’s federal states and the country’s 20 largest cities. This topic will also be discussed at this year’s IFA Berlin: edge and cloud computing, as well as connectivity and secure digital infrastructures, are among the trending topics in the ‘Computing & Gaming’ and ‘Communication & Connectivity’ show areas.
Depending on where they live, households can face annual differences of up to 43 euros in water and electricity costs for washing machines and up to 19 euros for dishwashers. Choosing an energy-efficient appliance can significantly reduce the impact of these local cost differences. IFA Berlin (www.ifa-berlin.com), the world’s leading event for home appliances and consumer electronics, analysed the water and electricity costs of running washing machines and dishwashers in Germany’s 100 largest cities.